EasyManua.ls Logo

Huawei iSitePower-M MAP05A1 - System Power-Off; Routine Maintenance

Huawei iSitePower-M MAP05A1
221 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12.1 System Power-O
Precautions
After the system powers o, the remaining electricity and heat may still cause
electric shocks and burns. Therefore, wear protective gloves 5 minutes after
the system is powered
o before performing any operation. Maintain the
product after all indicators are o.
When an iSitePower system is running, turning o the DC SWITCH of the
product cannot completely power
o the system. In this case, do not perform
maintenance operations on the product.
When the iSitePower system is running, there is no AC input and the AC input
power cable is energized. Therefore, do not maintain the iSitePower system.
Powering
O the System
Step 1 Set the AC input circuit breaker of the iSitePower-M to OFF.
Step 2 Set the DC SWITCH on the power module to OFF.
Step 3 Hold down the manual ON/OFF switch for 5s to shut down the battery module.
----End
12.2 Routine Maintenance
To ensure that the system operates properly for a long term, you are advised to
perform routine maintenance as described in this section.
CA UTION
Power o the system before cleaning the system, connecting cables, and checking
grounding reliability.
Table 12-1 Maintenance checklist
Check Item
Check Method Maintenance
Interval
System
cleanliness
Check periodically that the heat sinks
are free from obstacles and dust.
Once every 6 to 12
months
iSitePower-M (MAP05A1, MAB05B1)
User Manual 12 System Maintenance
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 172

Table of Contents

Related product manuals