Figure 10-65 Installing power communications cables
Step 4 Install parallel monitoring communications cables.
Figure 10-66 Installing monitoring communications cables
----End
10.8 (Optional) Installing Cables in Capacity Expansion
Scenarios
● In capacity expansion scenarios, bottom cascading cables must be routed from
the rear of the product.
● Cables outside the device must be routed through cable pipes.
iSitePower-M (MAP05A1, MAB05B1)
User Manual 10 Electrical Connections