EasyManua.ls Logo

Huawei iSitePower-M MAP05A1 - Arranging Cables; Subsequent Operations

Huawei iSitePower-M MAP05A1
221 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Check Item Expected Result
9 Installation
environment
The installation space is proper, and the
installation environment is clean and
tidy.
10.10.2 Arranging Cables
NO TICE
Check that the cables are correctly connected. Then fasten the cables to the
corresponding cable slots.
Figure 10-71 Cable hole distribution
10.10.3 Subsequent Operations
Procedure
Step 1 Close the maintenance compartment door.
iSitePower-M (MAP05A1, MAB05B1)
User Manual 10 Electrical Connections
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 160

Table of Contents

Related product manuals