Figure 6-19 Single system networking (dashed boxes indicating optional
components)
Figure 6-20 Parallel system networking (dashed boxes indicating optional
components)
(C) AC parallel box (D) PDB (E) Load
(F) Genset (G) Power grid (H) ATS
(I) AC PDC (J) Router (K) 4G wireless backhaul
module
(L) FusionSolar Smart PV
Management System
(M) FusionSolar app (O) AVR
(Q) AC switch
6.6 PV+Mains+Genset+ESS
Working Logic
1. Maximize PV Consumption:
a. When the mains is available:
iSitePower-M (MAP05A1, MAB05B1)
User Manual 6 Application Scenarios
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 64