EasyManua.ls Logo

Huawei iSitePower-M MAP05A1 - Page 72

Huawei iSitePower-M MAP05A1
221 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Parameter Description
Mains Outage Dry
Contact Status
Set the mains outage dry contact status.
Rated Power(kW) Set the genset output power to prevent genset overload
and system breakdown when ESSs are charged.
Genset Startup
SOC(%)
The value of Genset Startup SOC(%) must be at least
10% greater than the value of End-of-Discharge SOC for
Lithium Batteries(%).
Genset Shutdown
SOC(%)
The genset shuts down when the ESSs charge to the value
of Genset Shutdown SOC(%).
Figure 6-18 Setting lithium battery parameters
Networking Scenarios
NO TE
If an ATS without overvoltage/undervoltage protection is used, the ATS may make
misjudgment due to overvoltage/undervoltage of the power grid. To ensure the power
supply quality, install an AVR before the ATS.
iSitePower-M (MAP05A1, MAB05B1)
User Manual 6 Application Scenarios
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 63

Table of Contents

Related product manuals