EasyManua.ls Logo

Huawei iSitePower-M MAP05A1 - System Installation; Installation Preparations; Checking before the Installation

Huawei iSitePower-M MAP05A1
221 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 System Installation
7.1 Installation Preparations
7.1.1 Checking Before the Installation
Checking Outer Packaging
Before unpacking the product, check the outer packaging for damage, such as
holes and cracks, and check the model. If any damage is found or the model is not
what you requested, do not unpack the product and contact your vendor as soon
as possible.
Checking Deliverables
After unpacking the product, check that the deliverables are intact and complete,
and free from any obvious damage. If any item is missing or damaged, contact
your vendor.
NO TE
For details about the number of deliverables, see the
Packing List
in the packing case.
iSitePower-M (MAP05A1, MAB05B1)
User Manual 7 System Installation
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 70

Table of Contents

Related product manuals