Table B-2 Denition of the stripping length of cables for a parallel box (parallel
system scenario)
No
.
One End Other End 1 2
1 AC parallel
box
AC PDC (customer
side)
L wire: 120 mm
N wire: 120 mm
PE wire: 140 mm
L wire: 16 mm
N wire: 14 mm
PE wire: 14
mm
2 AC parallel
box
AC input port L wire: 410 mm
N wire: 340 mm
PE wire: 240 mm
L wire: 12 mm
N wire: 7 mm
PE wire: 7 mm
3 AC parallel
box
AC output port L wire: 115 mm
N wire: 220 mm
PE wire: 370 mm
L wire: 12 mm
N wire: 7 mm
PE wire: 7 mm
4 AC parallel
box
PDB (customer
side)
L wire: 300 mm
N wire: 325 mm
PE wire: 580 mm
L wire: 16 mm
N wire: 14 mm
PE wire: 14
mm
5 AC parallel
box
Site ground bar
(customer side)
N/A 14 mm
iSitePower-M (MAP05A1, MAB05B1)
User Manual B Preparing Cables and Terminals
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 210