Parameter Description
Operating Mode Maximize PV Consumption: PV power is preferentially
used for loads.
Maximize Power Backup: The mains is preferentially used
to supply power to loads. At the same time, the mains and
PV system charge the ESSs until the ESSs are fully charged.
Backup Power
SOC(%)
This parameter is available only when Operating Mode is
set to Maximize PV Consumption.
Figure 6-10 Setting lithium battery parameters
Networking Scenarios
Figure 6-11 Single system networking (dashed boxes indicating optional
components)
iSitePower-M (MAP05A1, MAB05B1)
User Manual 6 Application Scenarios
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 56