EasyManua.ls Logo

Huawei iSitePower-M MAP05A1 - Page 68

Huawei iSitePower-M MAP05A1
221 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Parameters Settings
Figure 6-13 Setting basic parameters
Table 6-6 Basic parameters
Parameter
Description
Output Voltage Set the output voltage and output frequency based on the
local power grid standards.
Output Frequency
Rated Power(kW) Set the genset power to prevent genset overload and
system breakdown when ESSs are charged.
Genset Startup
SOC(%)
The value of Genset Startup SOC(%) must be at least
10% greater than the value of End-of-Discharge SOC for
Lithium Batteries(%).
Genset Shutdown
SOC(%)
The genset shuts down when the ESSs charge to the value
of Genset Shutdown SOC(%).
iSitePower-M (MAP05A1, MAB05B1)
User Manual 6 Application Scenarios
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 59

Table of Contents

Related product manuals