Step 2 Mark mounting holes for the base.
Figure 7-3 Marking mounting holes for the base
Step 3 Mark the mounting holes for battery modules.
Figure 7-4 Marking the mounting holes for battery modules
Step 4 Drill holes and install expansion bolts.
When drilling holes, avoid the water pipes and power cables buried in the wall.
iSitePower-M (MAP05A1, MAB05B1)
User Manual 7 System Installation
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 75