Figure 4-91 Crimping the joint parts of the bare crimping terminal and the
conductor (JG2 terminal)
5. Push the heat shrink tubing toward the connector until the tube covers the
crimped part, and then use a heat gun to heat the tube, as shown in Figure
4-92.
Figure 4-92 Heating the heat shrink tubing (JG2 terminal)
Assembling the Cord End Terminal and Power Cable
Background
Figure 4-93 shows the components of a cord end terminal and a power cable.
HUAWEI NetEngine 8000 F
Hardware Guide 4 Hardware Installation and Parts Replacement
Issue 05 (2023-03-31) Copyright © Huawei Technologies Co., Ltd. 451