Preparing the FCU for measurement
Connect the inlet pressure hose
(black) to the port INLET of the FCU
(1).
Screw the measurement coupling
clockwise (2) onto the connection
and screw it finger tight.
Connect the other end of the INLET
pressure hose to the measurement
point of the system.
Switch on the internal pump.
This completes the hydraulic
installation.
The FCU will start with the
measurement.
FCU1310
en(us)
Page 42 / 124
BeWa FCU1310 V300 3371346f en-us 2017-01-27.docx 2017-01-27