Performing maintenance
WARNING
Hydraulic systems are under pressure
Danger of bodily injury
► Before working on the product, remove all
hydraulic and electrical connections.
At the latest, conduct the required configuration maintenance and inspection
work every six months, otherwise, whenever an error message or
malfunction makes it necessary.
The FCU is to be disconnected from the power supply and protected against
being inadvertently switched back on when performing any maintenance,
servicing, inspection or repair work.
Once maintenance work is complete, check that the safety devices of the
product are still working properly.
Any screwed fittings which have been undone/removed are to be checked to
see that they have been properly resecured.
FCUcleaning
Clean the control panel with a clean, moist cloth. Do not use any chemical
cleaning agent as these may damage the film attached to the surface of the
FCU.
Clean the outside of the closed FCU with a damp cloth.
FCU1310
en(us)
Page 87 / 124
BeWa FCU1310 V300 3371346f en-us 2017-01-27.docx 2017-01-27