Gas Connect Consoles
XPR170 Field Service Bulletin 810410 81
7. Install the top panel.
8. Install the side panel.
9. Supply the gas and fluid pressure to the cutting system.
10. Use the XPR web interface to make sure that the pressures are in the acceptable ranges.
For more information on the XPR web interface, refer to the Connect for
Communication in the XPR170 Instruction Manual (810060).