Gas Connect Consoles
XPR170 Field Service Bulletin 810410 83
Install a proportional valve
1. On the new base make sure that the 2 small O-rings are in the new base.
2. Align the arrow on the top of the base with the arrow on the manifold.
3. Use the 2 screws to install the base. Tighten to 1.6 N∙m (14 in∙lbf).
Make sure that the stem O-ring is against the brass piece. If not, you can
damage the O-ring.
4. Install the base cover.
5. Install the coil/solenoid.
6. Install the nut. Tighten to 3.3 N∙m (29 in∙lbf).
7. Install the connector.
8. Install the screw.
9. Install the side panel.
10. Install the top panel
11 . Supply the gas and fluid pressure to the system.
12. Use the XPR web interface tool to do a leak test.
13. Use the XPR web interface to make sure that the pressures are in the acceptable ranges.
For more information on the XPR web interface, refer to the Connect for
Communication in the XPR170 Instruction Manual (810060).