EasyManua.ls Logo

IDEAL HP290 - Page 142

IDEAL HP290
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Benchmark Checklist and Service Records
142 Installation and Maintenance
© Heating and Hotwater Industry Council (HHIC)
www.hhic.org.uk
* All installations in England and Wales must be notied to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certicate will then be issued to the customer.
Issue date: 20.08.2020
SERVICE RECORD
It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.
Service provider
Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions.
Always use the manufacturer’s specied spare part when replacing controls.
*A System inhibitor e󰀩cacy test is required on every annual service in accordance with the manufacturers’ instructions and BS 7593. It is only acceptable to not have under-
taken this if the service engineers attendance visit was in between annual services to attend a non-water facing component.
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes N/a
Comments:
Signature:
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes N/a
Comments:
Signature:
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes N/a
Comments:
Signature:
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes N/a
Comments:
Signature:

Table of Contents

Related product manuals