Chapter 5
Setting-up Operation, Daily Operation
Page 40 DM55 DynaDrum PP V6, Manual No.21-18, Rev.2.19
10. Open the clamshell before raising
the ram/platen.
To change a drum, see Chapter
“Drum Change-Out” on next pages.
11. Switch the Up/Down-Switch (3) to Up.
12. Switch the Auto/man-switch (2) to Man.
13. Press both Left & Right-Confirm-Buttons (4) to raising the platen full UP.
Be sure that the hose(s) are free to move with the platen.
14. Slide the drip tray (optional) onto the drip tray rails under the platen.
15. Rotate clamshell doors open. Clean any debris from the unit’s base plate.
16. Slide an opened drum of material into the unit. Be sure that the drum is resting
against the rear of the clamshell.
Keep away (your hands, head, etc.) from platen and piston pump!
Limbs may be drawn in. Risk of crushing!