Table 44: Site Preparaon Checklist
(Connued)
Item or Task For More Informaon Performed by Date
Select the type of rack or cabinet and
verify that it meets the minimum
requirements for the installaon of the
switch.
"Rack Requirements" on page
132
"Cabinet Requirements" on page
133
Plan rack or cabinet locaon, ensuring the
required space clearances.
"Clearance Requirements for
Airow and Hardware
Maintenance for an EX9214
Switch" on page 128
Secure the rack or cabinet to the oor
and building structure.
Cables
Plan the cable roung and management.
Acquire cables and connectors:
• Determine the number of cables
needed based on your planned
conguraon.
• Ensure that the distance between
hardware components to be
connected allows for cable lengths to
be within the specied maximum
limits.
119