Site Preparaon Checklist for an EX9214 Switch
The checklist in Table 44 on page 118 summarizes the tasks you need to perform to prepare a site for
installing an EX9214 switch.
Table 44: Site Preparaon Checklist
Item or Task For More Informaon Performed by Date
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
"Environmental Requirements
and Specicaons for EX Series
Switches" on page 120
Power
Measure distance between external
power sources and switch installaon
site.
Calculate the power consumpon and
requirements.
"AC Power Supply Specicaons
for EX9214 Switches" on page
48
"DC Power Supply Specicaons
for EX9214 Switches" on page
54
"Power Requirements for
EX9200 Switch Components" on
page 57
Calculang the Fiber-Opc
Cable Power Budget for EX
Series Devices
Calculang the Fiber-Opc
Cable Power Margin for EX
Series Devices
Rack or Cabinet
118