Installing a Roung Engine into an EX9200-SF3
To install a Roung Engine into an EX9200-SF3:
1. Aach an electrostac discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
2. Ensure that the ejector handles are not in the locked posion. If necessary, ip the ejector handles
outward.
3. Place one hand underneath the Roung Engine to support it.
4. Carefully align the sides of the Roung Engine with the guides inside the opening on the EX9200-
SF3.
5. Slide the Roung Engine into the EX9200-SF3 unl you feel resistance, and then press the faceplate
of the Roung Engine unl it engages the connectors.
6. Press both of the ejector handles inward to seat the Roung Engine.
7. Tighten the capve screws on the top and boom of the Roung Engine.
8. Connect the management device cables to the Roung Engine.
Powering On the Switch
See "Powering On an AC-Powered EX9200 Switch" on page 177 or "Powering On a DC-Powered
EX9200 Switch" on page 184.
Compleng the EX9200-SF3 Upgrade
To complete the upgrade procedure:
1. Verify that the installaon is successful and the EX9200-SF3 is online by issuing the show chassis
environment cb command:
user@switch> show chassis environment cb 0
CB 0 status
State Online
Temperature 30 degrees C / 86 degrees F
...
user@switch> show chassis environment cb 1
CB 1 status
State Online
Temperature 30 degrees C / 86 degrees F
...
Other details, such as, temperature, power, etc are also displayed along with the state.
235