EasyManua.ls Logo

KEISOKU GIKEN LOAD EDGE Series - Page 100

KEISOKU GIKEN LOAD EDGE Series
125 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Load Edge Series
100 Parallel Operations
Fig. 9-1-2 Connection between slaves (BOOSTER connection cables)
Use rear input terminals when in parallel operation. Never connect any devices to the
front panel terminals.
Use as short as possible cable and appropriate size for the current.
To minimize influence, place the load cable and BOOSTER connection cable as far as
possible.

Table of Contents