Load Edge Series
Parallel Operations 111
9.2.2 Connection procedure for multi-channel synchronized operation
Connect Master unit and Slave unit by attached BOOSTER cable. Connect with DUT with load
cables.
Refer to the “2.2 Cable connection” in detail.
Use load cable with appropriate cable size with flame resistant sheath.
1. Confirm OFF
Make sure all units are set at power OFF.
Press power switch to set it OFF position.
2. Connect loading terminals
With referring the drawing, connect all the loading terminals with DUTs.
3. Connect BOOSTER connector of each unit.
Connect BOOSTER_IN and BOOSTER_OUT by attached BOOSTER cable.
Pay great care to the connection since contrary will result damage to the unit.
9.2.3 Multi-Channel Synchronization setting
1. Power On all units.
Press power switch to power ON.
2. Select LOAD CONTROL at the menu.
It is necessary to select proper menu first.
Press menu key to call menu screen.