EasyManua.ls Logo

Linde H50D - Page 122

Linde H50D
310 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Maintenance
Inspection and maintenance overview
At operating hours
1000 2000 4000 5000 7000
8000 10000 11000 13000 14000
Carried
out
16000 17000 19000 20000
9
8
Chassis, tilt cylinders and steering axle: check the mountings
Check and grease other bearings and joints
Chassis frame
Check the parking brake for correct operation
Clean and grease steering axle
Steering cylinder and steering pivot pin: check the mountings
Controls
Check and oil the pedals
Electrics
Check the condition and secure positioning of electric cables, cable connectors and
connections
Battery: Check condition, acid level and acid density (even for maintenance-free
batteries)
Hydraulics
Hydraulic sy
stem: Check the oil level.
Check the ble
eder valve on the hydraulic oil tank for correct operation
Check the hy
draulic system for leaks
Double hos
es: check the pre-load
Load lift
system
Check the condition, secure mounting and function of the lift mast, lift mast chain, lift
cylinder and end stops
Adjust lift mast chain and spray with chain spray
Check fork arms and arm safety devices
Clean and grease the sideshift, check the mounting
Subsequent tasks
Carry out functional test and test drive
Attach maintenance sticker
110 Operating Instructions 394 807 10 01 EN 07/2011

Table of Contents

Related product manuals