EasyManua.ls Logo

MacDon R113 - Page 70

MacDon R113
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
215585 62 Revision A

$
%
&
Figure 4.3: Float Spring Right Side
3. Loosen retaining bolt (A) and rotate cover plate (B) away
from float spring bolt (C). Repeat on opposite side.
4. Fully loosen float spring bolt (C). Repeat on opposite side.

$
%
Figure 4.4: Carrier Frame
5. Place forklift forks under top beam (A) at opening (B). Lift
carrier frame slightly until pin at base of center-link anchor
is loose. Use a piece of wood to protect paint on frame.

$
%
Figure 4.5: Top Shield Left of Center-Link
6. Remove four M10 hex head bolts (A) and flat washers, and
remove top shield (B).
CAUTION
To avoid injury, keep fingers clear of opening at base of anchor.
ASSEMBLING THE ROTARY DISC PULL-TYPE FACTORY-INSTALLED TRANSPORT

Table of Contents

Other manuals for MacDon R113

Related product manuals