Maintenance overview
5.2 Maintenance plans
5 - 6 3 302 364 en Maintenance manual
GMK 4100L-1
25.11.2016
5.2.2 Maintenance plan W
Maintenance work on the CARRIER:
Weekly
Engine
– General inspection
à p. 7 - 18
Transmission
– General inspection
à p. 7 - 40
Transfer case
– General inspection
à p. 7 - 45
Angle gear
– General inspection
à p. 7 - 50
Axle lines
– General inspection
à p. 7 - 55
Wheels
– Checking the tyre pressure
à p. 7 - 68
Compressed air system
– Draining water from the compressed air system
à p. 7 - 93
– Checking for leaks
à p. 7 - 94
Hydraulic system
– Checking the hydraulic hoses
à p. 7 - 98
– Checking for leaks
à p. 7 - 98
Central lubrication system
– Checking the level
à p. 7 - 115
Other maintenance work
– Checking the windscreen washing system
à p. 7 - 139