EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK6300L-1

Manitowoc Grove GMK6300L-1 Maintenance Manual

Manitowoc Grove GMK6300L-1
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #100 background imageLoading...
Page #100 background image
Maintenance work on the carrier
7.3 Engine
7 - 24 3 302 719 en Maintenance manual
GMK6300L-1
13.02.2018
Topping up when the engine is cold
• Slowly top up the expansion tank (1) with
coolant until it is filled up to the lower
edge in the filler neck.
• Wait about 1 minute. Add more coolant
if necessary.
• Close the cover (1).
Check it when the engine is warm
• Start the engine.
• Let the engine run at idling speed for approx. 5 minutes.
• Switch off the engine.
• Check the coolant level when the engine is warm;
à Checking the coolant level, p. 7 - 15.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L-1 and is the answer not in the manual?

Manitowoc Grove GMK6300L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals