EasyManua.ls Logo

Manitowoc Grove GMK6300L-1

Manitowoc Grove GMK6300L-1
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance work on the superstructure
8.12 Cable drums and slewing angle sensor
13.02.2018
Maintenance manual 3 302 719 en 8 - 103
GMK6300L-1
8.12 Cable drums and slewing angle sensor
8.12.1 Maintenance of the slip ring assemblies
The slip ring assemblies are located in:
Spare parts and
tools
Clean, lint-free cloth.
Dry, oil-free compressed air.
Prerequisites
For cable drum 1
The main boom must be set down on the support; à Manual de
instrucciones
.
For cable drum 2
The main boom must be fully raised; à Manual de instrucciones.
The cover plate in front of the cable drum 2 is removed.
For cable drums 1 and 2
The engine must be switched off and secured against unauthorised use;
à p. 2 - 3.
The selector handle must be removed from the battery master switch.
s
1 Cable drum 1
2 Cable drum 2
M 6
Designation Quantity GROVE part no.
Cover gasket for cable drum 1 1 03325575
Cover gasket for cable drum 2 1 03137971

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Related product manuals