EasyManua.ls Logo

Manitowoc Grove GMK6300L-1

Manitowoc Grove GMK6300L-1
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance work on the carrier
7.19 Other maintenance work
13.02.2018
Maintenance manual 3 302 719 en 7 - 127
GMK6300L-1
7.19.6 Renewing the corrosion protection
Protective agent,
tools
Spray gun with spray extension.
–Brush.
Protective clothing, protective goggles.
Prerequisites The undercarriage of the truck crane must be thoroughly cleaned.
The truck crane must be raised on outriggers or parked over an
inspection pit.
The engine must be switched off and secured against unauthorised use;
à p. 2 - 3.
Checking At the factory, the underside of the carrier was sprayed with corrosion
protection for the first time.
The corrosion protection i
s solvent-free and is water soluble while being
sprayed on. A transparent, waxy,
protective film is formed after a drying
time of one hour.
Check the condition of the original protective film.
If required, remove any rust and touch up the paintwork before you
spray on a new protective film.
Processing
instructions
Observe the processing instructions for corrosion protection:
Processing temperature: above 10 °C (50 °F).
Removability before drying: With water.
Removability after drying: With solvent naphtha.
Drying time: 1 hour.
s
M 12
Protective agent GROVE part no.
Corrosion protection
03140192

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Related product manuals