EasyManua.ls Logo

Manitowoc Grove GMK6300L-1

Manitowoc Grove GMK6300L-1
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance work on the carrier
7.14 Hydraulic system
13.02.2018
Maintenance manual 3 302 719 en 7 - 87
GMK6300L-1
Protecting the
hose from dirt
When storing the hose
Close the hose ends (1) with the caps (2).
Connecting the
hose
Only use a hose with a connecting piece.
Remove the caps (4).
Put the hose end into the receptacle (3).
Remove the cap from the gauge port (1) and screw the connecting
piece (2) on to the gauge port – the gauge port opens.
s
S
Danger of contamination of the oil sample
If the hose with the connecting piece is dirty, the dirt can contaminate
the oil sample
in the sample container during the sampling process.
The laboratory analysis would then be incorrect.
For flushing, always allow 2 litres (0.5 gal) of oil to flow through the
hose into a receptacle before filling the sample container.
O
Danger due to escaping hydraulic oil
When you screw the connecting piece on to the gauge port, the gauge
port opens and oil
flows out of the hose. Put the hose end into a
receptacle before screwing on the connecting piece.
Always let consumables drain into suitab
le receptacles. Wipe up
any consumables that escape.
Store/dispose of consumables and any soaked equipment properly.
Ask about the applicable regulations.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Related product manuals