Maintenance overview
5.2 Maintenance plans
13.02.2018
Maintenance manual 3 302 719 en 5 - 5
GMK6300L-1
Maintenance work on the SUPERSTRUCTURE:
Daily/before putting into operation
Engine
– Checking the oil level
à p. 8 - 11
– Checking the air filter
à p. 8 - 14
– Checking the coolant level
à p. 8 - 15
Fuel system
– Draining off water from fuel filter 1
à p. 8 - 28
Exhaust system with exhaust emission control
– Checking the AdBlue tank level
à p. 8 - 36
Hydraulic system
– Checking the oil level
à p. 8 - 65
Hoist ropes
– Checking the winding
à p. 8 - 89
Electrical system
– Checking the lighting and indicators
à p. 8 - 111