Maintenance overview
5.2 Maintenance plans
13.02.2018
Maintenance manual 3 302 719 en 5 - 11
GMK6300L-1
Maintenance work on the SUPERSTRUCTURE:
every three months/after 250 oper. hrs.
Engine
–Notes;
à Engine manufacturer’s documentation à p. 8 - 11
Fuel system
– Replacing fuel filter 1
à p. 8 - 29
Slewing bearing
– Checking the screws
à p. 8 - 53
Hydraulic system
– Oil filter 1 – cleaning the magnetic rod
à p. 8 - 68
Main boom
– Lubricating the telescopic sections
à p. 8 - 82
– Checking the sheaves
à p. 8 - 86
Hoist ropes
– Lubricating the hoist rope
à p. 8 - 91
Hook blocks
– Checking the sheaves
à p. 8 - 109
Electrical system
– Checking the charge level of the batteries
à p. 8 - 112
– Charging the batteries using the battery charger
à p. 8 - 113
– Check the external starting socket
à p. 8 - 114