Massey Ferguson 5400 - Issue 1.a
05C02.20
GBA20 Power Shuttle
71. Immobilise the planet carrier (49) with a holding
tool, ref. 3378240M1 (see Fig. 13 and § G).
72. Remove screws (99) securing the cover (34)
(Fig. 12 and Fig. 13) and remove it.
73. Remove clutch discs (47) and intermediate plates
(46).
74. Separate the output sun gear (58), held by the snap
rings (61), from the primary shaft (55) (Fig. 12).
75. Remove snap ring (56) (Fig. 12).
76. Remove the planet carrier (49) with the double and
single pinion gears (52) (59).
77. On the planet carrier (49), remove:
- the plates (63),
- the double pinion gears (52) and the pins (50).
Mark their position,
- the single pinion gears (59) and pins (50). Mark
their position,
- the snap ring (98) and bearing (57).
N
OTE: The rotation of planet gears around the pins
(50) is on two rows of needle bearings (60), joined
and separated by a spacer (51).
I
MPORTANT: When the planet gears and the shafts
have been removed, check that no needle or
spacer remains in the planet carrier.
Fig. 13