EasyManua.ls Logo

MASSEY FERGUSON 5400 - Removal

MASSEY FERGUSON 5400
886 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Massey Ferguson 5400 - Issue 1.a
06F01.6
GPA20 hitch / Linkage
B . Removal
1. Remove (Fig. 3):
- the trailer electronic connector (1),
- the spool valve control cables (2),
- the hydraulic unions connected to the spool
valves (3),
- the trailer brake take-off an dits support, by loos-
ening the unions at both ends (Fig. 4),
- the lift rams supply pipes,
2. Disconnect (Fig. 1 and Fig. 2)
- the ground speed sensor harness (15),
- the position sensor harness (26),
- the PTO control cable 4-speed PTO, if fitted).
3. Remove the four screws from the spool valve
support.
4. Remove the spool valve support with the spool
valves.
5. Remove the upper pins from the rams and lift rods.
6. Remove the attachment screws (24) from the lift
cover (10).
7. Sling the cover and remove it.
Fig. 3
Fig. 4

Table of Contents

Related product manuals