EasyManua.ls Logo

MASSEY FERGUSON 5400 - Removing, Splitting and Disassembling the Planet Carrier Assembly

MASSEY FERGUSON 5400
886 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Massey Ferguson 5400 - Issue 1.a
05D02.14
GBA20 Speedshift with Power Shuttle
E . Removing, splitting and disas-
sembling the planet carrier
assembly
Removal (Fig. 11)
16. Remove brake disc (21), intermediate plate (20),
Belleville washer (18) and planet carrier assembly
(50).
Splitting
17. Put the planet carrier assembly on a workbench
with the unit (9) turned upwards.
18. Remove the screws (3).
19. Separate the unit (9) from the hydraulic cover (25)
while holding sun gears (6) and (7) (Fig. 9).
Disassembly
NOTE: The text and figures in this paragraph concern
the disassembly of a planet carrier for a ground speed
of 40 kph.
20. Remove the input sun gear (7), visually identifying
the direction of the lubricating grooves.
21. Drive out shafts (8) using a drift or a mallet
(Fig. 10).
N
OTE: Shafts are tight fitted in the thickest part of
the planet carrier with the lubrication hole turned
towards the hydraulic cover (25).
22. Remove pinion gears (12).
23. Recover needle bearings (16), spacers (14) and
washers (17).
24. Remove the output sun gear (6).
9
7
3
1525
6
MA-05-00365A
Fig. 9
8
MA-05-00366A
Fig. 10

Table of Contents

Related product manuals