Massey Ferguson 5400 - Issue 1.a
05I02.9
GBA20 layshaft with Power Shuttle
H . Final operations
46. Refit the input unit (see chapter 5).
47. Refit the selector cover (see chapter 5).
48. Refit the forward clutch of the Power Shuttle (see
chapter 5).
Attach a sling to the gearbox. Lower it from the
workbench or suitable fixture.
49. Couple the gearbox and the engine (see chapter 2).
50. Assemble the tractor between the gearbox and the
rear axle (see chapter 2).
51. Check:
- oil tightness of the hydraulic circuits;
- correct operation of electrical circuits.
52. Carry out a road test of all controls.
53. Check oil tightness of unions and mating faces
(gear selector cover, gearbox on rear axle).