EasyManua.ls Logo

MASSEY FERGUSON 5400 - Preliminary Operations; Removing and Refitting the Selector Rail and the Forks

MASSEY FERGUSON 5400
886 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Massey Ferguson 5400 - Issue 1.a
05G02.7
GBA20 output shaft with Power Shuttle
B . Preliminary operations
1. Split the tractor between the gearbox and the rear
axle (see chapter 2).
2. Remove the selector cover (see chapter 5).
3. If necessary, remove screw (1) (Fig. 11).
C . Removing and refitting the
selector rail and the forks
NOTE: The tractor is split. Consequently, the sensor rail
removal is made easier following separation which is
to be made from the rear side of the gearbox housing.
Apart from this point, the procedure remains
unchanged.
Disassembly
4. If the tractor is fitted with a creeper unit, remove
pin (1), locknut (2), adjustable lock (3), fork (4) with
sleeve (5) (Fig. 3).
If the tractor is fitted with a super-creeper unit, the
fork and its lock are removed as described above,
except for the absence of the pin (1).
5. Remove the selector rail and the forks (see
chapter 5).
Reassembly
6. Clean and check all components. Replace any
defective parts.
7. Refit the selector rail and the forks (see chapter 5).
8. Depending on the equipment, install sleeve (5),
fork (4), adjustable lock (3) and pin (1) (Fig. 3).
To adjust the fork, see chapter 5.
Fig. 3

Table of Contents

Related product manuals