EasyManua.ls Logo

MASSEY FERGUSON 5400 - Final Operations; Reassembling the Planet Carrier, Refitting the Ring Gear and the Unit

MASSEY FERGUSON 5400
886 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Massey Ferguson 5400 - Issue 1.a
05J01.7
GBA20 Creeper unit
E . Reassembling the planet carrier,
refitting the ring gear and the unit
13. Check and clean the components. Replace any
defective parts.
14. Install the sun gears (9). Use miscible grease in oil
to fit the needles (10).
15. Assemble the plates (13) (14).
16. Assemble the shafts (12), directing them as
required for assembling the circlip (16).
17. Fit the circlip (16). Manually check the axial clear-
ance and rotation of each pinion gear.
18. Position the stop plate (15) and the ring gear (19)
on the housing (Fig. 3).
19. Position the friction washers (2) (18) coated with
miscible grease on the planet carrier (4).
20. Slide the planet carrier on the output shaft.
21. Position the closing plate (3). Tighten screws (5) to
a torque of 34 - 52 Nm.
F . Final operations
22. Reasassemble the fork and the rear sleeve / link
shaft / coupler assembly (see chapter 5).
23. Reassemble the PTO assembly.
2-speed PTO
- Refit the power take-off clutch (see chapter 7).
- Refit the layshaft, the driving pinion and the
PTO top cover (see chapter 7).
4-speed PTO
- Refit the power take-off clutch (see chapter 7).
- Refit the layshaft, the driving pinion and the
PTO top cover (see chapter 7).
24. Refit the left-hand hydraulic cover (if removed) and
the right-hand hydraulic cover (see chapter 9).
25. Carry out a road test of the creeper unit.
26. Check PTO and PTO brake operation.
3
1
2
19
15
18
5
MA-05-00513B
Fig. 3

Table of Contents

Related product manuals