Massey Ferguson 5400 - Issue 1.b
09B01.19
Right-hand cover – 57 l/min Open Centre
99. Position the composite seal (33) and seal (34).
Assemble the flange (35) on the high flow rate
stage (32) (Fig. 21) according to the marks made
during disassembly.
100.
Centre the flange (35). Tighten the screws (36) to:
40 - 47 Nm.
101.
Refit the catchdog (15) on the flat of the driving
pinion (28). Position the seal (16).
102.
Assemble the flange (14) according to the marks
made before disassembly.
103.
Fit the bearing assembly (11) (with recess),
centred by the pin (10), in the low flow rate stage
(37). Turn lubricating grooves G and recess E
towards inlet port O, and groove R of the compo-
site seal (12) towards the flange (Fig. 22).
104.
Position the composite seal (12) and seal (13)
(Fig. 22).
105.
Assemble the low flow rate stage (37) on the
flange (14) according to the marks made during
disassembly.
106.
Place the pinions (8) (9) in the low flow rate stage
while ensuring that the flat of the drive pinion (9) is
correctly positioned in the catchdog (15).
107.
Fit the bearing assembly (5) (without recess),
centred by the pin (6), in the low flow rate stage
(37). Turn lubricating grooves G towards inlet port
O and groove R of the composite seal (3) towards
the closing plate (1) (Fig. 23).
Fig. 21
Fig. 22
Fig. 23