Massey Ferguson 5400 - Issue 1.a
05B01.7
GBA20 input unit with mechanical reverse shuttle
Final operations
21. After refitting the input unit, remove the tool
ref. 3376883M1 and the handling bar from the
front cover.
22. Assemble the spacer and hydraulic unit (1) of the
engine clutch on the front cover of the input unit
(Fig. 9 and chapter 4).
23. Fit and adjust the selector (2) on the mechanical
reverse shuttle (Fig. 2 and chapter 5).
24. Refit the selector cover (see chapter 5).
25. Refit the PTO shaft (Fig. 10 and chapter 2).
26. Assemble the tractor between the engine and the
gearbox (see chapter 2).
27. Bleed the hydraulic unit of the engine clutch (see
chapter 9).
28. Carry out a road test of the mechanical reverse
shuttle and the Speedshift (low range and high
range).
Fig. 9
Fig. 10