EasyManua.ls Logo

Mitsubishi Electric Q173DSCPU - Page 216

Mitsubishi Electric Q173DSCPU
556 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 - 23
4 MOTION SFC PROGRAMS
POINT
The number of parallel branches need not match that of couplings at a parallel
coupling point.
(In the example of the diagram in Section 4.9.3 (2), the number of parallel branches
is 3 and that of couplings is 2.)
When a WAIT transition is set right after a parallel coupling, the stop completions of the
axes are not included in the waiting conditions if the parallel coupling is preceded by
motion control steps. To perform a parallel coupling on stop completions, set WAIT
transitions before a parallel coupling.
(
)
K5
K4K3K2
G1
Parallel coupling
If this is WAIT, stop completions of axes started at K2 to K5
are not included in transition conditions.
(
)
K5
K4K3K2
G1
Parallel coupling
When you want to perform a
coupling on stop completions
of axes started in K2 to K5,
set WAIT transition in each
route to make parallel coupling.
G2 G3 G4 G5

Table of Contents

Related product manuals