Maintenance
5-8
Part 1108061-02
E 2015 Nordson Corporation
Maintenance Check List
Activity
Color
Change
Each
Shift
Daily Weekly Monthly
Every Six
Months
Cleaning
Fire detector head lenses*
n
Booth enclosure
n n
Final filter compartment
n
Feed and bulk transfer hoses
n n
Pump assemblies
n n
Spray guns
n n
Sieve
n n
Transfer pumps
n n
Canopy Conditioning**
n
Resistance Checks—Spray Guns
and Cables
n
Visual Checks
Air supply drop leg
n
Air dryer drain
n n
Cartridge filter differential
pressure gauge
n
Electrical connections
n
Final filter differential pressure
gauge
n
Fire detector sensors
n n
Gaskets
n
Oscillators and in/out gun
positioners
n
Workpiece clearance***
n
Workpiece grounding
n n
Powder supply levels
n n
After filter waste hoppers****
n
* Clean the fire detector head lenses every 4 hours.
** Or as required.
*** Continuously monitor the workpiece clearance.
**** Frequency varies depending on application. Check more frequently if spraying to waste often.
Lubrication
Every 6
months
Roll-on/roll-off wheel bearings (optional equipment)
n
Fan and motor bearings
n