EasyManua.ls Logo

Roche Cedex Bio - Page 419

Roche Cedex Bio
558 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
Operator’s Manual · Version 3.4 E-21
Cedex Bio analyzer 10 Messages and alarms
List of alarm messages
20002 <Clean Water and Waste> completed.
20003 <Replace Photometer Lamp> completed.
20004 <Clean Probe Manually> completed.
20005 <Prime Fluid System> completed.
20006 <Clean Housing> completed.
20007 <Deproteinize Probe> completed.
20008 <Clean Reagent Disk> completed.
20009 <Database Backup> completed.
20010 <Call Service Rep.> completed.
20011 <Clean ISE Tower Manually> completed.
20012 <Replace ISE Unit Tubing> completed.
20013 <Replace ISE Pump Tubing> completed.
20014 <Replace ISE %s Electrode> completed.
20015 <Initialize ISE Reference Sensor> completed.
20016 <Clean ISE Tower Automatically> completed.
20017 <Initialize ISE Unit> completed.
20019 <Electrode Service> completed.
20020 <Activate Electrodes> completed.
20021 <Prime ISE Reference and Calibrator> completed.
20022 <Condition ISE Tubing> completed.
20023 An unknown action %d was completed successfully.
20024 Installation completed. The intervals of the maintenance
actions were reset successfully (except daily maintenance
actions).
20025 <Abs. Air/Water Calibration> completed.
20026 The external water reservoir was refilled.
20027 The external waste container was emptied.
20028 <Daily Prepare Actions> completed.
20029 Database cleanup completed.
20030 <Initialize Degaser Fluid Sensor> completed.
ID Message Comment
Table E-1
List of alarm messages (Continued)

Table of Contents

Related product manuals