Roche Diagnostics
Operatorโs Manual ยท Version 3.4 E-21
Cedex Bio analyzer 10 Messages and alarms
List of alarm messages
20002 <Clean Water and Waste> completed.
20003 <Replace Photometer Lamp> completed.
20004 <Clean Probe Manually> completed.
20005 <Prime Fluid System> completed.
20006 <Clean Housing> completed.
20007 <Deproteinize Probe> completed.
20008 <Clean Reagent Disk> completed.
20009 <Database Backup> completed.
20010 <Call Service Rep.> completed.
20011 <Clean ISE Tower Manually> completed.
20012 <Replace ISE Unit Tubing> completed.
20013 <Replace ISE Pump Tubing> completed.
20014 <Replace ISE %s Electrode> completed.
20015 <Initialize ISE Reference Sensor> completed.
20016 <Clean ISE Tower Automatically> completed.
20017 <Initialize ISE Unit> completed.
20019 <Electrode Service> completed.
20020 <Activate Electrodes> completed.
20021 <Prime ISE Reference and Calibrator> completed.
20022 <Condition ISE Tubing> completed.
20023 An unknown action %d was completed successfully.
20024 Installation completed. The intervals of the maintenance
actions were reset successfully (except daily maintenance
actions).
20025 <Abs. Air/Water Calibration> completed.
20026 The external water reservoir was refilled.
20027 The external waste container was emptied.
20028 <Daily Prepare Actions> completed.
20029 Database cleanup completed.
20030 <Initialize Degaser Fluid Sensor> completed.
ID Message Comment
Table E-1
List of alarm messages (Continued)