EasyManuals Logo

Roche Cedex Bio User Manual

Roche Cedex Bio
558 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #462 background imageLoading...
Page #462 background image
Roche Diagnostics
F-12
Operatorโ€™s Manual ยท Version 3.4
13 ISE description Cedex Bio analyzer
Basic operation
Basic operation
Operation of the ISE unit is integrated in the operation of the main analyzer.
The following sections contain some ISE specific information on operation-related
issues.
e
For general information on operating the main analyzer, see the corresponding sections
in Chapter 2 Introduction to the analyzer and Chapter 5 Daily operation.
For specific ISE tasks, see Chapter 14 ISE operation.
Samples
The sample tubes are placed on the sample area of the main analyzer.
Calibration
The ISE unit requires frequent calibration to ensure the accuracy of the test results
obtained.
Main calibration The electrodes are calibrated with a two-point calibration using ISE Solution 1 and 2.
The main calibration is typically performed during the Prepare phase.
One-point calibration The electrodes are calibrated after each ISE measurement using the on-board ISE
Calibrator indirect. This calibration is an integral part of each ISE measurement and
is performed automatically.
ISE Standby
If there is no measurement for more than three minutes, the ISE unit switches to
Standby status. In this status, ISE Calibrator indirect and ISE Reference Solution are
pumped into the measuring channel and moved a short distance at regular intervals.
Also, every two hours the ISE tubing is primed with ISE Calibrator indirect and ISE
Reference Solution. This is done to prevent the following problems:
o Flow of ISE Reference Solution backwards into the measuring channel, which can
damage the electrodes because of the high ion concentration of the ISE Reference
Solution.
o Crystallization of salts in the tubing, causing blockages.
The ISE unit has a separate power supply. Therefore, the Standby status is
maintained even if the main analyzer is switched off.
NOTICE
Damage to electrodes and possible tubing blockage
o Do not unplug or switch off the ISE power supply. Periodic flow of solutions must be
performed at all times.
o If you intend not to use the ISE unit for more than one week, you should deactivate it.
This saves ISE fluids, reduces wear and tear of the tubing, and lowers the likelihood of
malfunctions and errors occurring. (See Deactivating the ISE unit on page F-68.)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Roche Cedex Bio and is the answer not in the manual?

Roche Cedex Bio Specifications

General IconGeneral
BrandRoche
ModelCedex Bio
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals