Roche Diagnostics
F-32
Operatorโs Manual ยท Version 3.4
14 ISE operation Cedex Bio analyzer
Daily operation
9
Empty the waste container. 1. Empty the waste container.
2. Press the Wa st e button to confirm.
3. Refill the water container.
4. Press the Water button to confirm.
10
Finish your shift.
1
Do one of the following:
o Log off the system.
o Shut down the system and switch off the main
analyzer if there is no other shift.
Step User action
Table F-5
Steps for finishing the shift (Continued)
If you intend not to use the ISE unit for more than one week, you should deactivate it. This
saves ISE fluids, reduces wear and tear of the tubing, and lowers the likelihood of malfunc-
tions and errors occurring. (See Deactivating the ISE unit on page F-68.)