6. OPERATION
6-2
6.1 Operation Sequence
The frequency of power ON/OFF should be 10 times/H or less, and 50 times/day or less.
6.1.1 Power ON Sequence
Fig. 6-1
Control power ON (r, t)
Sequence power ON (CN1)
2.5 Sec
or less
mplifier ready output (RDY)
Start ready ON (external switch)
Main circuit power supply
(R, S, T)
Release
Dynamic brake release
1
Start ready complete (SRDY)
1 The dotted line denotes an option.
2 RDY1 and RDY2 in the safety circuit are optional.
3 The thermostat output in the external regenerative resistor can be connected to
general-purpose input CN1 of the amplifier.
S
T
r
t
Install a spark killer
on the magnetic contactor
(Okaya Electric Industries Co.,
Ltd.: CRE-50500)
Safety circuit
3φ
200 V to
230 VAC
50 Hz to
External regenerative resistor:
Overheating detection thermostat
System
erro
Input to
CN1
External regenerative resisto
DC power supply
for brake
Holding
brake
Fast-blown fuse
Prevention against
common/ normal
mode noise
Circuit
braker
2
PY
RDY1
MC
RDY2
MC
MC
Encoder
signal
CN1
CN2
MC
Controlle
V
W
3
1
24 VDC
OP
1
MC
RY
Noise
filter
1 The time period from main circuit power ON to SRDY is approx. 1 sec. However, in
case of single phase power of Amplifier with 50A capacity, that will be approx. 1.5 sec.