34 Entris
®
 II Advanced Line Operating Instructions
 Installation
5  Installation
5.1  Scope of Delivery
Item Quantity
Device 1
Weighing pan 1
Frame draft shield 1
Power supply unit with country-specific 
AC adapters
1
Shock absorber 4
Operating Instructions 1
5.2  Selecting an Installation Site
Procedure
 t Make sure that the following conditions are met at 
the installation site:
Condition Characteristics
Ambient conditions Suitability tested (see 
ambient conditions)
Setup surface   Stable, even surface with 
little vibration
  Sufficient space for the 
device (for space 
requirements, see 
Chapter “14.10 Device 
Dimensions”, page 49)
  Sufficient load-bearing 
capacity for the device 
and peripheral devices 
(see Chapter “14.12 
Metrological Data”, 
page 50for device 
weight)
5.3  Unpacking the Device
Procedure
 t Unpack the device.
 t Install the device at the intended installation site.
 t We recommend keeping the original packaging to 
return the device securely and appropriately, e.g. for 
repairs.
5.4  Removing the Transport Lock
Procedure
1
 t Remove the 
transport locks (1) 
and retain them for 
later use.
5.5  Mounting the Device
Procedure
1
2
3
 t Place the frame 
draft shield (3) on 
the balance.
 t Attach the four 
shock absorbers (2).
 t Place the weighing 
pan (1) on top.
5.6  Acclimatizing
When a cold device is brought into a warmer area: The 
temperature difference can lead to condensation of 
humidity in the device (moisture formation). Moisture in 
the device can lead to malfunctions.
Procedure
 t Allow the device to acclimatize for approx. 2 hours at 
the installation site. Ensure that the device is 
disconnected from the power supply during that 
time.