Batching With Clearance
When batch is complete, prefeeder cuts off; belt drive,
after approx. another half belt circuit. Conveyor belt is
empty. Delay for point of discharge should be
activated
(N 01 = YES).
Select keyboard for START source (B 06 = DE + T).
Function “Next W/Belt Empty” automatically activates
clearance mode. For details, see OPERATION
chapter.
The smallest possible actual batch amount
corresponds to the load on belt from weighing platform
to point of feed.
Parameter Schedule:
B 06 START source OP
G 06 Belt tracking time Tn ca. 3 s
Tracking time of feed rate acquisition after
belt cut-off.
N01 CPD Active YES
Delay for point of discharge
0837
VBW INTECONT PLUS
Details
BV-H2214 GB 98
Technische
Redaktion PDE-RD
Transmission to third parties and reproduction of
this documentation are not permitted. Schenck
Process GmbH reserves all rights of ownership
and copyrights.