Activate/Deactivate EasyServe
This function lets you control your INTECONT using
the “EasyServe” PC service tool.
GT Call function distributor and select
“Activate EasyServe” function.
Enter communication parameters using Block R.
Condition: This function has to be activated
with the parameter A09.
Note: Upon power failure, the current
status is stored, i.e. the “Activate
EasyServe” function needs not be
reselected.
Connection to PC can also be made using a 9-pole
SUB-D connector on X4 (RS 232 only) or a Phoenix
connector on X5 (RS232, RS422 or RS485).
See also Wiring Diagram in chapter DETAILS.
Prefeeder
The “Start/Stop Prefeeder” function lets you activate or
deactivate prefeeder. Select “Start”, and INTECONT
will control your prefeeder. In Stop state, material flow
is interrupted and scale can be tared.
Prerequisites : External prefeeder present and
controlled by INTECONT.
Activate function using parameter
N 01.
GT Call function distributor and select
“Start Prefeeder” or “Stop Prefeeder”
function.
f Start control signal.
Printing
The printing functions are available only if the option
card is present.
Print Batch
The batch report can be printed:
1. using “Print Batch” function
2. automatically after each complete batch
(Parameter J02 = YES).
Start of printing disables the “Make-up” function for the
current batch.
Prerequisites : Batch complete, scale OFF.
Print format : Order of sequence, line and column
divisions can be selected at will
(Parameter Block J).
GT Call function distributor and select
“Print Batch” function.
Start function.
N Abort printing.
Batch Number: Consecutive number of batch
20.11.02: Date and time
Batch Setpoint: Preset batch amount
Batch Actual Val.: Amount batched (actual value)
Totalizer 1:
Totalizing counter 1
Totalizer 2: Totalizing counter 2
Zero Set before: Feeder run time after last taring or
zeroing operation (see Service
Values)
Events : available during printing
0837
VBW INTECONT PLUS
Control
BV-H2214 GB 12
Technische
Redaktion PDE-RD
Transmission to third parties and reproduction of
this documentation are not permitted. Schenck
Process GmbH reserves all rights of ownership
and copyrights.
Batch Nummer 40
20.11.02 16:49:41
Batch Setpoint 0.150 t
Batch Actual Val. 0.150 t
Totalizer 1 0.806t
Totalizer 2 806.47 kg
Zero Set beforer 19 min.
Events
E1 Power Failure O01