Control via prefeeder:
Batch complete, conveyor belt is empty.
0 Start batch and conveyor belt.
Open prefeeder.
1 Stop belt, if necessary; cut off belt and prefeeder
drive.
2 Resume batching.
3 Changeover to dribble feed is possible, but not
always reasonable.
4 Stop prefeeder if precalculated distance to
setpoint is reached.
5 Batch complete.
Conveyor belt continues running for approx. 1/2
belt circuit.
Dribble feed and cut-off point are self-optimizing, i.e.
they are automatically corrected after every batch.
0837
INTECONT PLUS VBW
Operating Principle
BV-H2214 GB 23
Transmission to third parties and reproduction of
this documentation are not permitted.
SchenckProcess GmbH reserves all rights of
ownership and copyrights.
Technische
Redaktion PDE-RD