TechnicalInstructions  LMVSeries
DocumentNo.LV51000
Section4 Page28 SCCInc.
AdditionalTipsforCommissioning
If an LMV52 is being commissioned, activate the O
2
sensor as soon as possible.Once the O
2
sensor is heated, this will show a fast responding O
2
value on the AZL screen during Ratio
ControlCurvecommissioning.Thissensorreads%O
2
wetsothevaluewillbesomewhatlower
thananexternalfluegasanalyzer.
Usingafuelflowmeter(temporaryorpermanent)forcommissioningisalwaysagoodideaeven
for LMV51’swithoutO
2
trim.If thefuelinput (heat output)increaseslinearlywith firing rate,
the PID loop in any load control will work much better.A te mporary, insertion type of flow
meterisavailablefromSCCInc.forthispurpose.
Ifburnerheadpressure mustbeusedasalastresorttoestimatefiringrate, bearinmindthat
head pressure does not increase with gas flow in
a linear manner.There is a square root
relationship between the differential pressure across the burn er head and the gas flow.This
relationshipis verysimilartohowthe pressurevariesacrossafixedorificewithanincreaseor
decreaseinflow.Also,furnacepressuremustbeaccountedforbyhookingupbothsidesofthe
manometer,onesidetothebu
rnerheadpressureandonesidetothefurnacepressure.
CarbonMonoxide(CO)is producedwhen combustionisincomplete,typicallyduetotheflame
being too rich or too lean.CO is potentially ex plosive when mixed with air in the right
proportions.For CO to be explosive in air, it must reach a concentration of at least 12.5%
(125,000ppm)withanignitionsourcepresent.
Ifaburneriscommissionedproperly,actuat
orcurvesshouldincreasesmoothlywithincreasing
load (firing rate).One exception to this would be the FGR actuator (Aux1 or Aux3) which
commonlydecreases(closes)asfiringrateincreases.Curvesshouldalwaysbesmooth,withno
sharpcorners
.
The best and fastest meth od to commission a burner with an LMV5 is to set up a small table
wherethetechniciancanhavehislaptop,AZL,fuelflowmeterandexternalfluegasanalyzerall
within arm's reach.This allows the curve points to be input rapidly and accurately.If the
information is entered in the laptop point by point, a very nice startup report will also be
generated.
TheACS450softwareisnotasfastasusingtheAZL tocommissionthe LMV5.Sincethisisthe
case, theACS450istypicallynotusedtocommission the LMV5.However, theACS450isvery
valuablewhenusedtodownloadan.mdbfile(allparametersettings,faultandlockouthistory,
inEnglish)andalsowhenusedtodownload.parfiles(themachinelanguageparametersetfrom
the LMV5).It is recommen
ded to download both of these files after commissioning, so that
thereisabackuprecordofallparameterandcurvesettings.
Togobackoutofthemenuandcheckburneroperation,pressthe<and>buttonsatthesame
time.This will take the cursor to Normal Operation, so the normal operation screen can be
viewedbypressingEnter.Thiscanbedoneanywhereinthemenuaslongasasingleparameter
isnotcurrentlydisplayed.PressingEscwilltakethecursorback intowhereitwasin
themenu.
HOME

Table of Contents

Other manuals for Siemens LMV5 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens LMV5 Series and is the answer not in the manual?

Siemens LMV5 Series Specifications

General IconGeneral
BrandSiemens
ModelLMV5 Series
CategoryControl Systems
LanguageEnglish

Related product manuals